As some of you know John is gone at an ROTC camp called Warrior Forge. He is gone for 5 weeks and sadly for him the kids won't stop growing. Mallory has decided that she wanted to be potty trained. Thankfully for me it only took 1 week and it has stuck. Sadie has learned to run now and is losing much of her baby weight. I spend my time quilting, crocheting, and chasing after the 2 girls. I though that staying so busy would make the time go by faster, until I looked at the calendar today and realized John has only been gone for 6 days. This is going to be a LONG 5 weeks.
My parents are living with us now. Well I guess it would be we are living with my parents since this is their house. We took care of it for them while they were on their mission. When they got back they decided they wanted to live in St. George, but that only lasted about a month. Now we have a full house and lots of helpers when it comes to the girls. I don't mind the few extra minutes of sleep I get until Mallory comes in and says, "Sorry for waking you up but I NEED pancakes." I guess Grandma doesn't make them as good as I do.
My goal is to get some pictures up on the blog so you can see how big Mallory and Sadie have gotten. I hope I can get that done before John gets home.
Friday, July 18, 2008
Sunday, June 22, 2008
Follow Up News and a normal occuring life.
Well, I guess this time just wasn't meant to be. Kathy Miscarried, so we won't be having a baby in February. But we are young and more babies will come (we hope).
On another note, the flapper in the toilet in our bathroom had a rubber "chain" on it. Well that "chain" broke, so I got a new flapper and put it in. Well, that flapper didn't flush right. So we got a whole new flush set, the tube, the flapper, and the part that goes between the tank and the bowl. Well I was installing the new stuff, I saw a year stamped into the tank - 1977. The guts looked to be of about the same age. I also noticed some cracks in the porcelain. I didn't think much of it put the new stuff in and reinstalled the tank, and flushed a few times. It was leaking water all along the bottom. I tried tightening the bolts. but that only made things worse. It was leaking out of the cracks. So, we had to get at least a new tank. Since I don't own the house, my wife called the owner, my father-in-law. He wanted to replace the whole toilet. So I went out and mowed the lawn, and Kathy and I ran some errands, and we get a new toilet, in addition to a 1/4 turn shut off valve. We get home, got the girls to bed, and I go to town on getting the rest of the old toilet removed and the new one installed. As I go to replace the shut-off valve, I find out that they have copper pipe stubbed up through the floor, not a nipple. This stinks quite a bit because the current shutoff valve has some problems and really needs to be replaced. Unfortunately I can't go get one to fit because by this time, of course Home Depot/Lowe's is closed. The rest of the Toilet installed flawlessly, and it is definitely better than what was there before (no forceful jet on the old to help things move along = lots of clogs). That was the bulk of my day. The typical one to one and a half hour job turns into a 3 hour affair.
On another note, the flapper in the toilet in our bathroom had a rubber "chain" on it. Well that "chain" broke, so I got a new flapper and put it in. Well, that flapper didn't flush right. So we got a whole new flush set, the tube, the flapper, and the part that goes between the tank and the bowl. Well I was installing the new stuff, I saw a year stamped into the tank - 1977. The guts looked to be of about the same age. I also noticed some cracks in the porcelain. I didn't think much of it put the new stuff in and reinstalled the tank, and flushed a few times. It was leaking water all along the bottom. I tried tightening the bolts. but that only made things worse. It was leaking out of the cracks. So, we had to get at least a new tank. Since I don't own the house, my wife called the owner, my father-in-law. He wanted to replace the whole toilet. So I went out and mowed the lawn, and Kathy and I ran some errands, and we get a new toilet, in addition to a 1/4 turn shut off valve. We get home, got the girls to bed, and I go to town on getting the rest of the old toilet removed and the new one installed. As I go to replace the shut-off valve, I find out that they have copper pipe stubbed up through the floor, not a nipple. This stinks quite a bit because the current shutoff valve has some problems and really needs to be replaced. Unfortunately I can't go get one to fit because by this time, of course Home Depot/Lowe's is closed. The rest of the Toilet installed flawlessly, and it is definitely better than what was there before (no forceful jet on the old to help things move along = lots of clogs). That was the bulk of my day. The typical one to one and a half hour job turns into a 3 hour affair.
Sunday, June 8, 2008
News for those who don't know
Pregnancy Wonders
Well, number three is on the way. Hurray! Kathy is currently 7 weeks along. We are excited for this one. We had a little scare because Kathy had some light bleeding during the time she was supposed to, but everything seems fine now after confirmation with her doctor. She is showing most normal signs of pregnancy, except sickness. So far for names we have Jackson John and Meagan or Jenna Suzanne. That is the news of the family.
Well, number three is on the way. Hurray! Kathy is currently 7 weeks along. We are excited for this one. We had a little scare because Kathy had some light bleeding during the time she was supposed to, but everything seems fine now after confirmation with her doctor. She is showing most normal signs of pregnancy, except sickness. So far for names we have Jackson John and Meagan or Jenna Suzanne. That is the news of the family.
Friday, January 4, 2008
Progress
Well I seem to have been able to redo the Entity classes and get things to work better for Downloading and storing the database. Now I just need to see about getting notes taken care of on a per chapter bases. I think most things will have to be taken care of by chapter. Everything else is appearing to work for now. I would also like to figure out how to get the scroll pane to stay at the top. I will have to play around with that for a little bit. Once I get that and the notes done, I think I will be ready to go for a .1 release. The only "Compilation" I haven't yet gotten with the new entity classes is the Old Testament. Everything else has been gotten without a hitch. I little bit more coding and some outside testing and I should be able to release a 0.1 of it. I think I will tackle footnotes and Profiles/Users for the .2 release, then go back in and add highlighted text, etc for .3. Maybe for the .5 release I will deal with links and linking. i need to come up with a better release plan, so people will know where it is headed and when.
Sunday, December 30, 2007
Implementation changes Design
Well, These past few week have been quite productive. I now have the project entirely on code.google.com, and I also was able to get the data from the web to the database successfully. This required changes to the design, but because of the lack of understanding with the persistence API many more things will be changing that fit better with the persistence API. I just have to make it display. There is quite a bit more work to do on that aspect, though it shouldn't be as hard as learning the persistence API. There are still some changes to be made to the entity classes, which will result in changes in the database. It shouldn't be too hard though. It will be nice to have those changes done. At some point I would like to get many things worked out, but programing is an incremental endeavor, and one that won't always be fast increments.
So A review of things left to be done for a .1 release:
So A review of things left to be done for a .1 release:
- Finish the chapter selection process
- Write the necessary methods to display the chapter in the space provided
- Create/edit notes
- (a maybe) Have the basics of the users down.
Monday, December 17, 2007
After a Long Absence
OK, it has been a while since I posted before, and since a lot has changed, I decided to post again. Perhaps the biggest change is that I've re based the program on to the swing application framework, and then also I changed the hosting site to Google's site instead of source forge. I think Google has a few more ready made tools that make it easier. Anyways. I'm pretty much gonna have to redo the GUI section, though that shouldn't be too hard, especially with the GUI designer in Netbeans.
Some of the things I have accomplished within the past week or two:
Hopefully I can get .1 finished by the beginning of the school year. i had a scare with my laptop going down last night. The power cord got cut, and had started to short. After a little bit i opened it up and started to examine how it was made, etc. I found I could fix it after I had thought about it enough to realize I didn't need to try to save it anymore. It looks uglier, but it is more stable then before.
I think that is all the news and advancements made in the project for this post.
Some of the things I have accomplished within the past week or two:
- Got the scripture HTML converter fine tuned and working with the Database objects.
- Started (and still working on) getting a class written that facilitates downloading the scriptures.
- Wrote the functions to dynamically get the copyright from a scripture site.
- Got the project based on Swing Application Framework
- Switched Hosting to Goolge Code from sourceforge. This took care of some repository cleanup i was going to have to do.
Hopefully I can get .1 finished by the beginning of the school year. i had a scare with my laptop going down last night. The power cord got cut, and had started to short. After a little bit i opened it up and started to examine how it was made, etc. I found I could fix it after I had thought about it enough to realize I didn't need to try to save it anymore. It looks uglier, but it is more stable then before.
I think that is all the news and advancements made in the project for this post.
Sunday, July 15, 2007
Status of Scripture Study Plus
I decided to keep a status update on Scripture Study Plus, what the advances are week by week.
To Start off with, right now the program is in a currently unusable state. So far we have a base graphical design, and some underlayment for some of the functionality. I think I have decided to go with the JavaDB(Apache Derby). It is embeddable across all platforms, and the drivers come with java.(as of 6 or later) Some of the most pressing things to do are:
To Start off with, right now the program is in a currently unusable state. So far we have a base graphical design, and some underlayment for some of the functionality. I think I have decided to go with the JavaDB(Apache Derby). It is embeddable across all platforms, and the drivers come with java.(as of 6 or later) Some of the most pressing things to do are:
- Connect to an embedded database. (This is my top priority)
- Reliably download the scriptures from online.
- Connect the UI to the database.
- Make notes workable.
- Make highlighting workable
- Make rudimentary search work.
- Make an installer for the program.
Subscribe to:
Posts (Atom)